Criteria for Static Cleats
Criteria for Static Cleats
Criteria for Static Cleats
Probe Fueling Swivel Arm Instructions
Swivel Arm and Swivel Joint Assembly
Static Test Requirements for Easing Out Line Fittings
General Assembly Notes for Static Cleats Assembly
Riding Line Test Arrangement
UNDERWAY REPLENISHMENT is an Unclassified naval warfare publication. It shall be handled by Department of the Navy holders in accordance with the administrative procedures contained in NWP l-01.
These Naval Instructions for optimum utilization of lighting fixtures and lighting installations on Naval ships
This Notice changes the guidance found in Reference (a) concerning the inspection and certification of vessels under the Maritime Security Program
The below documents are renderings of and assembly notes and instructions.
Navy Underway Replenishment Publication Criteria for Static Cleats General Notes for Welding and Maintaining Cleats Probe Fueling Swivel Arm Instructions...